The Super Package by AMR BuildTech is designed for clients who want Owners who want the Standard package but with higher floor-to-floor height (10 ft), granite kitchen platform, kitchen dado tiles and stronger quality control.. Below you can view the complete scope, specifications, and inclusions in a transparent format.
The Super package bridges Standard and Premium for owners who want one meaningful upgrade — a 10 ft floor-to-floor height (vs 9.5 ft in Standard) for a more spacious feel, a granite kitchen platform with dado tiles, and kitchen sink included. Everything else is the same quality as Standard. This package is popular among owners building their primary family home who want to avoid the feeling of low ceilings without going into the premium finish range. The granite kitchen included in the Super package saves approximately ₹80,000–₹1.2 lakh compared to adding it as an upgrade to Standard.
A quick-reference summary of what defines the Super package — see the full scope table and price-covers breakdown below for complete specifications.
The ₹1999/sqft rate for the Super package is built up from the following work items — each priced into the rate as material, labour and site supervision combined. This is the exact scope AMR BuildTech executes on site for this package, item by item.
Complete footing, columns, plinth beam and roof slab with a 10 ft floor-to-floor height (vs 9.5 ft in Standard) — more concrete, steel and shuttering height per floor, which is the main cost driver of this upgrade.
Full internal and external walls in fly ash bricks or blocks — lighter than the red brick used in Standard, with better thermal insulation, plus full internal and external plaster.
Granite platform slab, ceramic dado tiles above the platform, and a stainless steel sink — all included as standard in Super, whereas these are a paid upgrade on the Standard package.
Vitrified tiles in every room plus matching staircase tile finish — same flooring specification as Standard.
Full concealed copper wiring with all points as per drawing, and complete CPVC plumbing with overhead tank — same full-coverage specification as Standard, just built into a taller structure.
Additional site QC checkpoints at each milestone compared to Standard, reflecting the higher per-sqft investment and the added structural complexity of the taller floor height.
Indicative cost range: ₹1,999 – ₹2,150 per sqft. These are civil + finishing estimates — plot cost, boundary wall and interior furniture are not included.
| House Size / Type | Estimated Cost (Super Package) |
|---|---|
| 1,000 sqft (3 BHK compact) | ₹20.0 – ₹21.5 Lakh |
| 1,200 sqft (3 BHK standard) | ₹24.0 – ₹25.8 Lakh |
| 1,500 sqft (3 BHK spacious) | ₹30.0 – ₹32.3 Lakh |
| 2,000 sqft (G+1 duplex floor) | ₹40.0 – ₹43.0 Lakh |
This table gives a transparent scope for the Super package. Items marked ✅ are included, ❌ are not included, and NA means not applicable. Items marked ℹ show the specification or value.
| Scope Item | Specification / Inclusion |
|---|---|
| Finished Building Stage | ℹ Finished Building — Upgraded Quality |
| Plinth Beam Height | ℹ Up to 3 ft |
| Floor-to-Floor Height | ℹ 10 ft (higher than Standard) |
| Parapet Wall Height | ℹ Up to 2'6" |
| Boundary Wall Limit | ℹ Up to 5 ft height, 33% of plot frontage |
| Curtain Wall (Below Road) | ❌ Not included |
| Earthwork / Excavation | ✅ Included |
| Backfilling & Compaction | ✅ Included |
| PCC / Grit Slab | ✅ Included |
| RCC Structure | ✅ Footing + columns + plinth beam + slab + staircase |
| Steel Brand | ℹ Nakoda / Goyal / Kamdhenu / equivalent approved brand |
| Steel Grade | ℹ Fe 415 / Fe 500 as per structural drawing |
| Concrete Grade | ℹ M20 slabs/beams, M25 columns |
| RCC Curing Monitoring | ✅ Strong engineer QC — 21-day curing minimum |
| Brickwork / Masonry | ✅ Fly ash brick / AAC block masonry as per drawing |
| Brickwork Type | ℹ Fly Ash Bricks / AAC Blocks |
| Fly Ash Bricks Option | ✅ Standard for this package |
| Plaster (Internal/External) | ✅ Both internal and external plaster included |
| Concealed Conduiting | ✅ Included |
| Electrical Wiring | ✅ Complete concealed wiring as per drawing |
| Plumbing | ✅ Complete plumbing points as per drawing — CPVC pipes |
| Flooring Finish | ✅ Vitrified tile flooring in all rooms |
| Staircase Finish | ✅ Matching vitrified tiles on staircase |
| Main Door Height (Up to) | ✅ 7 ft |
| Internal Door Height (Up to) | ✅ 7 ft |
| Door Frames | ✅ Solidwood frame ( upto Rs 2500 per Door) |
| Windows | ✅ Aluminium 3-track (with mosquito mesh track) |
| MS Grill | ✅ Standard MS grill |
| Kitchen Platform | ✅ Granite kitchen platform included |
| Sink | ✅ SS sink included |
| Kitchen Dado Tiles | ✅ Ceramic dado tiles included |
| Interior Paint | ✅ Standard interior emulsion paint |
| Exterior Paint | ✅ Standard exterior emulsion/weather coat |
| Elevation (Basic) | ✅ Basic elevation plaster finish included |
| Modular Kitchen | ❌ Not included — kitchen platform ready for fitout |
| TV Unit | ❌ Not included |
| Wardrobe / Almirah | ❌ Not included |
| False Ceiling | ❌ Not included |
| Underground Tank | ✅ Available — charged extra if required |
For a complete single-floor Super house (1,000–1,200 sqft). Higher floor height adds marginal time to structural work. G+1 duplex: 12–16 months.
Payment for the Super package is structured so you only ever pay for work that is either about to start, already visibly in progress, or fully completed and inspected — never for work that exists only on paper. There are two parts to this: a one-time mobilisation advance paid in full upfront, followed by a repeating 50% / 25% / 25% pattern applied to every construction stage after that.
This is the only payment made before physical work starts, and it is paid in full — not in parts. It funds everything needed to convert your site from an empty plot into an active construction site: site layout marking, a makeshift storage shed for cement/steel/tools, barricading/fencing where required, appointment of a site guard/watchman if needed, initial material procurement (cement and steel booking), and deployment of the labour team. Without this advance, a contractor cannot reserve manpower or place material orders against your project — so this stage exists to convert your booking into an active, scheduled project rather than a pending enquiry. Once the mobilisation advance is paid, every stage after it follows the 50% / 25% / 25% pattern below — the mobilisation advance itself is a one-time, standalone payment and is not split.
For every subsequent construction stage (footing, columns, slab, brickwork, flooring, and so on), work only begins once the first half of that stage's payment is received. This covers the material and labour AMR BuildTech commits upfront to start the stage — steel, cement, bricks or tiles are procured and masons/labour are allocated specifically for that stage once this payment is in.
Once the stage is visibly halfway done — for example, columns cast on half the plot, or brickwork completed on half the walls — the next 25% is due. This checkpoint means you are paying in step with what you can actually see on site, not on a fixed date regardless of progress. It also keeps the project cash-flow moving so labour and material supply for the stage don't stall midway.
The last quarter of each stage's payment is due only once that stage is fully complete — this is deliberately the largest checkpoint held back until the work is finished and can be inspected. It gives you real leverage: if a stage isn't finished to specification, that final 25% simply isn't released yet. This same 50/25/25 pattern repeats for every stage through to final handover, so you're never more than one incomplete stage's worth of payment ahead of the physical work on site.
The exact stages billed depend on this package's scope — a structure-only package is billed only against RCC milestones, while a fully finished package also includes brickwork, electrical, plumbing, flooring and finishing milestones. Your formal agreement sets out the specific stage-wise schedule for your project before work begins, and all payments are made via bank transfer to AMR BuildTech's official account.
Site utilities — client-provided, free of cost: Water and electricity required for construction work must be arranged and provided by the client at the site, free of cost, for the entire duration of the project. This is separate from the mobilisation advance — mobilisation funds the contractor's own site setup (storage, guard, labour deployment), while ongoing water and electricity supply for construction activities remains the client's responsibility throughout execution.
| Upgrade / Add-on | Details |
|---|---|
| Teak Door Frames | Replace better frames with teak / hardwood frames prices above Rs. 2500 per door |
| Exterior Texture Paint | Upgrade exterior paint to weather coat texture finish |
| Modular Kitchen | Add modular kitchen (mica finish) — upgrade to Premium package |
| False Ceiling | Add false ceiling in living/dining and master bedroom |
| Underground Water Tank | RCC underground sump — quoted separately |
| Upgrade to Premium | Add modular kitchen + TV unit + false ceiling → Premium package |
| Steel Grade | Fe 415 / Fe 500 (as per structural drawing) |
| Concrete Grade | M20 slabs/beams, M25 columns |
| Cement Brand | Ultratech / ACC / Wonder / equivalent — 53 grade for structural works |
| Warranty | 1-year defect responsibility on all civil and finishing works. |
Select up to 3 packages and compare scope side-by-side with clear icons.
Compare PackagesWe will share proposal + costings + workflow + next steps.
WhatsApp for Super Proposal