The Essential Package by AMR BuildTech is designed for clients who want Owners planning phased construction — complete RCC structure first, finishing later at own pace or budget.. Below you can view the complete scope, specifications, and inclusions in a transparent format.
The Essential package is ideal for plot owners in Bhopal who want to secure their RCC structure now and handle finishing — flooring, doors, paint, electrical — themselves or in a later phase. This is a common approach for NRI owners, owners with tight initial budgets, or those who want to do phased construction over 2–3 years. It is also the right choice when you want to let the slab cure thoroughly before committing to a finishing contractor.
Indicative cost range: ₹699 – ₹950 per sqft. These are civil + finishing estimates — plot cost, boundary wall and interior furniture are not included.
| House Size / Type | Estimated Cost (Essential Package) |
|---|---|
| 600 sqft (small G ground floor) | ₹4.2 – ₹5.7 Lakh |
| 1,000 sqft (standard G floor) | ₹7.0 – ₹9.5 Lakh |
| 1,200 sqft (G floor on 30×40 plot) | ₹8.4 – ₹11.4 Lakh |
| 1,500 sqft (G floor on 30×50 plot) | ₹10.5 – ₹14.3 Lakh |
This table gives a transparent scope for the Essential package. Items marked ✅ are included, ❌ are not included, and NA means not applicable. Items marked ℹ show the specification or value.
| Scope Item | Specification / Inclusion |
|---|---|
| Finished Building Stage | ℹ Structure Only |
| Plinth Beam Height | ℹ Up to 3 ft (from road level) |
| Floor-to-Floor Height | ℹ 9.5 ft |
| Parapet Wall Height | NA No brickwork — not applicable |
| Boundary Wall Limit | NA Upgrade available on request |
| Curtain Wall (Below Road) | NA Not applicable in this stage |
| Earthwork / Excavation | ✅ Site clearance + excavation (hard strata extra) |
| Backfilling & Compaction | ✅ Standard compaction |
| PCC / Grit Slab | NA Upgrade available |
| RCC Structure | ✅ Footing + columns + plinth beam + slab + staircase |
| Steel Brand | ℹ Nakoda / Goyal / Kamdhenu / equivalent approved brand |
| Steel Grade | ℹ Fe 415 / Fe 500 as per structural drawing |
| Concrete Grade | ℹ M20 slabs/beams, M25 columns |
| RCC Curing Monitoring | ✅ Engineer QC — minimum 21-day curing |
| Brickwork / Masonry | NA Not applicable in this stage |
| Brickwork Type | NA No brickwork in this stage |
| Fly Ash Bricks Option | NA No brickwork in this stage |
| Plaster (Internal/External) | NA Not applicable in this stage |
| Concealed Conduiting | NA No brickwork available |
| Electrical Wiring | NA Not applicable in this stage |
| Plumbing | NA Not applicable in this stage |
| Flooring Finish | NA Not applicable in this stage |
| Staircase Finish | NA Not applicable in this stage |
| Main Door Height (Up to) | NA No door openings in this stage |
| Internal Door Height (Up to) | NA No door openings in this stage |
| Door Frames | NA No brickwork available |
| Windows | NA No brickwork available |
| MS Grill | NA No brickwork available |
| Kitchen Platform | NA Kitchen not formed in this stage |
| Sink | NA Kitchen not formed in this stage |
| Kitchen Dado Tiles | NA Kitchen not formed in this stage |
| Interior Paint | NA Not applicable in this stage |
| Exterior Paint | NA Not applicable in this stage |
| Elevation (Basic) | NA Not applicable in this stage |
| Modular Kitchen | NA Kitchen not formed in this stage |
| TV Unit | NA Not applicable in this stage |
| Wardrobe / Almirah | NA Not applicable in this stage |
| False Ceiling | NA Not applicable in this stage |
| Underground Tank | NA Upgrade available on request |
For a single-floor RCC structure (G floor). Timeline depends on plot size, column count and slab area. G+1 duplex structure takes 4–6 months.
All payments are milestone-based — you pay in line with actual site progress.
| Stage | Payment & Trigger |
|---|---|
| 1st Instalment (Mobilisation) | 15% — on agreement signing and site mobilisation |
| 2nd Instalment (Excavation done) | 20% — after excavation and PCC |
| 3rd Instalment (Footing cast) | 20% — after foundation footing casting |
| 4th Instalment (Columns + Plinth beam) | 20% — after columns and plinth beam |
| 5th Instalment (Slab cast) | 20% — after roof slab casting |
| 6th Instalment (Completion) | 5% — on structural completion and handover |
| Upgrade / Add-on | Details |
|---|---|
| PCC / Grit Slab | Add PCC bed below slab level for better base — recommended for waterlogging-prone plots |
| Boundary / Compound Wall | Up to 5 ft compound wall on available frontage — quoted separately per running foot |
| Underground Water Tank | RCC underground sump tank (5,000–10,000 litre) — quoted separately |
| Hard Strata Excavation | If rock or hard murrum encountered below 3 ft — charged per cft as actuals |
| Upgrade to Starter | Add brickwork + plaster on top of Essential to reach Starter stage |
| Steel Grade | Fe 415 / Fe 500 (as per structural drawing) |
| Concrete Grade | M20 for slabs and beams; M25 for columns (standard design) |
| Cement Brand | Ultratech / ACC / Wonder / equivalent approved brand (43 or 53 grade as per design) |
| Warranty | 1-year structural defect responsibility on RCC work executed by AMR BuildTech. |
Select up to 3 packages and compare scope side-by-side with clear icons.
Compare PackagesWe will share proposal + costings + workflow + next steps.
WhatsApp for Essential Proposal