The Starter Package by AMR BuildTech is designed for clients who want Homeowners who want a structurally complete, plastered shell — ready for independent finishing of flooring, doors, electrical and plumbing.. Below you can view the complete scope, specifications, and inclusions in a transparent format.
The Starter package is for owners who want to go beyond just the RCC frame and get a full structural shell — brickwork walls, internal and external plaster, and concealed conduit pipes laid in walls — before stopping and finishing the rest on their own schedule. This is popular among owners who want to do the "wet work" first (masonry, plaster) under a supervised contractor and then handle flooring, doors, paint and electrical independently or through a local labour team. It is also a good option for investment properties where you want a rentable shell quickly.
A quick-reference summary of what defines the Starter package — see the full scope table and price-covers breakdown below for complete specifications.
The ₹1099/sqft rate for the Starter package is built up from the following work items — each priced into the rate as material, labour and site supervision combined. This is the exact scope AMR BuildTech executes on site for this package, item by item.
Complete footing, columns, plinth beam, roof slab and staircase — same structural specification as the Essential package: M25 grade concrete for footing/columns, M20 for slabs/beams, Fe415/Fe500 TMT steel.
Full masonry in fly ash bricks, AAC blocks or red bricks (as per approved drawing) for every internal and external wall, laid to the wall thickness and layout shown in the structural/architectural drawing.
Standard cement plaster applied to all internal and external wall surfaces, giving a smooth, paint-ready finish — this is what distinguishes Starter from Essential, which stops at bare brick/RCC.
PVC conduit pipes laid concealed inside walls and slabs at the time of brickwork/plaster, following the electrical layout drawing. This prepares the house for wiring later without any wall-cutting — wiring, switches and points themselves are not included at this stage.
Every structural and masonry milestone — footing, columns, slab, brickwork, plaster — is inspected and signed off by an AMR BuildTech engineer before the next stage proceeds.
Indicative cost range: ₹1,099 – ₹1,350 per sqft. These are civil + finishing estimates — plot cost, boundary wall and interior furniture are not included.
| House Size / Type | Estimated Cost (Starter Package) |
|---|---|
| 600 sqft | ₹6.6 – ₹8.1 Lakh |
| 1,000 sqft | ₹11.0 – ₹13.5 Lakh |
| 1,200 sqft | ₹13.2 – ₹16.2 Lakh |
| 1,500 sqft | ₹16.5 – ₹20.3 Lakh |
This table gives a transparent scope for the Starter package. Items marked ✅ are included, ❌ are not included, and NA means not applicable. Items marked ℹ show the specification or value.
| Scope Item | Specification / Inclusion |
|---|---|
| Finished Building Stage | ℹ Starter Stage (Structure + Brickwork + Plaster + Conduiting) |
| Plinth Beam Height | ℹ Up to 3 ft |
| Floor-to-Floor Height | ℹ 9.5 ft |
| Parapet Wall Height | ℹ Up to 2'6" |
| Boundary Wall Limit | ❌ Not included |
| Curtain Wall (Below Road) | ❌ Not included |
| Earthwork / Excavation | ✅ Included |
| Backfilling & Compaction | ✅ Included |
| PCC / Grit Slab | ✅ Included |
| RCC Structure | ✅ Footing + columns + plinth beam + slab + staircase |
| Steel Brand | ℹ Nakoda / Goyal / Kamdhenu / equivalent approved brand |
| Steel Grade | ℹ Fe 415 / Fe 500 as per structural drawing |
| Concrete Grade | ℹ M20 slabs/beams, M25 columns |
| RCC Curing Monitoring | ✅ Engineer QC — minimum 21-day curing |
| Brickwork / Masonry | ✅ Full brickwork as per drawing |
| Brickwork Type | ℹ Red Bricks (standard Bhopal specification) |
| Fly Ash Bricks Option | NA Red brick standard; fly ash on request |
| Plaster (Internal/External) | ✅ Both internal and external plaster included |
| Concealed Conduiting | ✅ Conduit pipe laying for electrical — wiring not included |
| Electrical Wiring | ❌ Not included — shell ready for wiring |
| Plumbing | ❌ Not included |
| Flooring Finish | ❌ Not included |
| Staircase Finish | ❌ Not included |
| Main Door Height (Up to) | ❌ Openings formed — frames/doors not included |
| Internal Door Height (Up to) | ❌ Openings formed — frames/doors not included |
| Door Frames | ❌ Not included |
| Windows | ❌ Not included |
| MS Grill | ❌ Not included |
| Kitchen Platform | ❌ Not included |
| Sink | ❌ Not included |
| Kitchen Dado Tiles | ❌ Not included |
| Interior Paint | ❌ Not included — plaster ready for painting |
| Exterior Paint | ❌ Not included |
| Elevation (Basic) | ❌ Not included |
| Modular Kitchen | ❌ Not included |
| TV Unit | ❌ Not included |
| Wardrobe / Almirah | ❌ Not included |
| False Ceiling | ❌ Not included |
| Underground Tank | ❌ Upgrade available on request |
For a single-floor (G) completed shell. Brickwork adds 4–6 weeks after structure; plaster adds 3–4 weeks. G+1 Starter shell takes 5–8 months.
Payment for the Starter package is structured so you only ever pay for work that is either about to start, already visibly in progress, or fully completed and inspected — never for work that exists only on paper. There are two parts to this: a one-time mobilisation advance paid in full upfront, followed by a repeating 50% / 25% / 25% pattern applied to every construction stage after that.
This is the only payment made before physical work starts, and it is paid in full — not in parts. It funds everything needed to convert your site from an empty plot into an active construction site: site layout marking, a makeshift storage shed for cement/steel/tools, barricading/fencing where required, appointment of a site guard/watchman if needed, initial material procurement (cement and steel booking), and deployment of the labour team. Without this advance, a contractor cannot reserve manpower or place material orders against your project — so this stage exists to convert your booking into an active, scheduled project rather than a pending enquiry. Once the mobilisation advance is paid, every stage after it follows the 50% / 25% / 25% pattern below — the mobilisation advance itself is a one-time, standalone payment and is not split.
For every subsequent construction stage (footing, columns, slab, brickwork, flooring, and so on), work only begins once the first half of that stage's payment is received. This covers the material and labour AMR BuildTech commits upfront to start the stage — steel, cement, bricks or tiles are procured and masons/labour are allocated specifically for that stage once this payment is in.
Once the stage is visibly halfway done — for example, columns cast on half the plot, or brickwork completed on half the walls — the next 25% is due. This checkpoint means you are paying in step with what you can actually see on site, not on a fixed date regardless of progress. It also keeps the project cash-flow moving so labour and material supply for the stage don't stall midway.
The last quarter of each stage's payment is due only once that stage is fully complete — this is deliberately the largest checkpoint held back until the work is finished and can be inspected. It gives you real leverage: if a stage isn't finished to specification, that final 25% simply isn't released yet. This same 50/25/25 pattern repeats for every stage through to final handover, so you're never more than one incomplete stage's worth of payment ahead of the physical work on site.
The exact stages billed depend on this package's scope — a structure-only package is billed only against RCC milestones, while a fully finished package also includes brickwork, electrical, plumbing, flooring and finishing milestones. Your formal agreement sets out the specific stage-wise schedule for your project before work begins, and all payments are made via bank transfer to AMR BuildTech's official account.
Site utilities — client-provided, free of cost: Water and electricity required for construction work must be arranged and provided by the client at the site, free of cost, for the entire duration of the project. This is separate from the mobilisation advance — mobilisation funds the contractor's own site setup (storage, guard, labour deployment), while ongoing water and electricity supply for construction activities remains the client's responsibility throughout execution.
| Upgrade / Add-on | Details |
|---|---|
| Electrical Wiring | Add concealed wiring, MCB board and basic light/fan points — upgrade to Basic package |
| Plumbing | Add complete plumbing points and sanitary connections |
| Basic Flooring | Cement punning (smooth cement) flooring in all rooms — upgrade to Basic package |
| Boundary Wall | Up to 5 ft compound wall on available frontage |
| Underground Tank | RCC underground sump (5,000–10,000 litre) |
| Upgrade to Basic | Add electrical, plumbing, cement punning floor and basic doors to reach full Basic stage |
| Steel Grade | Fe 415 / Fe 500 (as per structural drawing) |
| Concrete Grade | M20 slabs/beams, M25 columns |
| Cement Brand | Ultratech / ACC / Wonder / equivalent approved brand |
| Warranty | 1-year defect responsibility on RCC and masonry work. |
Select up to 3 packages and compare scope side-by-side with clear icons.
Compare PackagesWe will share proposal + costings + workflow + next steps.
WhatsApp for Starter Proposal