The Executive Package by AMR BuildTech is designed for clients who want Owners wanting premium construction specs — higher ceilings, UPVC windows, granite frames and modular kitchen — at a price point below Premium.. Below you can view the complete scope, specifications, and inclusions in a transparent format.
The Executive package is positioned for owners who want the high-specification construction quality of the Premium package but are willing to skip the TV unit and wardrobe inclusions to save cost. It delivers 11.5 ft floor height, UPVC 3-track windows, granite door frames (9 ft main, 8 ft internal), premium vitrified tiles, modular kitchen, false ceiling, and premium paint. It is a popular choice for villa-style independent homes and premium duplex construction in Bhopal areas like Bawadiya Kalan, Arera Colony extension and Kolar Road.
Indicative cost range: ₹2,199 – ₹2,400 per sqft. These are civil + finishing estimates — plot cost, boundary wall and interior furniture are not included.
| House Size / Type | Estimated Cost (Executive Package) |
|---|---|
| 1,000 sqft | ₹22.0 – ₹24.0 Lakh |
| 1,200 sqft | ₹26.4 – ₹28.8 Lakh |
| 1,500 sqft | ₹33.0 – ₹36.0 Lakh |
| 2,000 sqft (G+1) | ₹44.0 – ₹48.0 Lakh |
This table gives a transparent scope for the Executive package. Items marked ✅ are included, ❌ are not included, and NA means not applicable. Items marked ℹ show the specification or value.
| Scope Item | Specification / Inclusion |
|---|---|
| Finished Building Stage | ℹ Executive Finished Building + Interior Basics |
| Plinth Beam Height | ℹ Up to 5 ft |
| Floor-to-Floor Height | ℹ 11.5 ft |
| Parapet Wall Height | ℹ Up to 2'6" |
| Boundary Wall Limit | ℹ Up to 6.5 ft height, 50% of plot frontage |
| Curtain Wall (Below Road) | ✅ Included |
| Earthwork / Excavation | ✅ Included |
| Backfilling & Compaction | ✅ Included |
| PCC / Grit Slab | ✅ Included |
| RCC Structure | ✅ Footing + columns + plinth beam + slab + staircase |
| Steel Brand | ℹ Nakoda / Goyal / Kamdhenu / equivalent approved brand |
| Steel Grade | ℹ Fe 415 / Fe 500 as per structural drawing |
| Concrete Grade | ℹ M20 slabs/beams, M25 columns |
| RCC Curing Monitoring | ✅ Strong engineer QC — minimum 21-day curing |
| Brickwork / Masonry | ✅ Red brick masonry as per drawing |
| Brickwork Type | ℹ Red Bricks |
| Fly Ash Bricks Option | NA AAC blocks on request |
| Plaster (Internal/External) | ✅ Both internal and external plaster included |
| Concealed Conduiting | ✅ Included |
| Electrical Wiring | ✅ Complete concealed wiring as per drawing |
| Plumbing | ✅ Complete plumbing points as per drawing |
| Flooring Finish | ✅ Premium vitrified tile flooring in all rooms |
| Staircase Finish | ✅ Premium tile finish on staircase |
| Main Door Height (Up to) | ℹ 9 ft |
| Internal Door Height (Up to) | ℹ 8 ft |
| Door Frames | ℹ Granite / Stone Frame |
| Windows | ℹ UPVC 3-track (with mosquito mesh track) |
| MS Grill | ✅ Premium MS grill finish |
| Kitchen Platform | ✅ Granite kitchen platform included |
| Sink | ✅ SS sink included |
| Kitchen Dado Tiles | ✅ Ceramic dado tiles included |
| Interior Paint | ✅ Premium interior paint |
| Exterior Paint | ✅ Premium exterior weather coat / texture |
| Elevation (Basic) | ✅ Elevation plaster + design bands included |
| Modular Kitchen | ✅ Modular kitchen included |
| TV Unit | ❌ Not included — upgrade to Premium |
| Wardrobe / Almirah | ❌ Not included — upgrade to Luxury |
| False Ceiling | ✅ False ceiling — living, dining and master bedroom |
| Underground Tank | ✅ Available — charged extra if required |
For a single-floor Executive house (1,000–1,500 sqft). Modular kitchen and false ceiling add 4–5 weeks over Standard timeline. G+1 duplex: 14–18 months.
All payments are milestone-based — you pay in line with actual site progress.
| Stage | Payment & Trigger |
|---|---|
| 1st (Mobilisation) | 15% — on agreement and site mobilisation |
| 2nd (Foundation done) | 10% — after excavation and footing casting |
| 3rd (Slab cast) | 20% — after roof slab and staircase |
| 4th (Brickwork + Plaster done) | 15% — after masonry and plaster completion |
| 5th (Flooring + Doors + Windows) | 20% — after tiles, UPVC windows, doors |
| 6th (Modular Kitchen + Ceiling) | 15% — after modular kitchen and false ceiling |
| 7th (Final Handover) | 5% — on paint, elevation and final handover |
| Upgrade / Add-on | Details |
|---|---|
| TV Unit | Add TV unit in living room — upgrade to Premium package |
| Wardrobe / Almirah | Add built-in wardrobe in master bedroom — upgrade to Luxury |
| Textured Stone Elevation | Stone cladding or ACP panel elevation upgrade |
| Underground Water Tank | RCC sump tank — charged extra if required |
| Upgrade to Premium | Add TV unit → Premium package (₹2,499/sqft) |
| Steel Grade | Fe 415 / Fe 500 (as per structural drawing) |
| Concrete Grade | M20 slabs/beams, M25 columns |
| Cement Brand | Ultratech / ACC / Wonder / equivalent — 53 grade throughout |
| Warranty | 1-year defect responsibility on civil works; modular kitchen manufacturer warranty applies. |
Select up to 3 packages and compare scope side-by-side with clear icons.
Compare PackagesWe will share proposal + costings + workflow + next steps.
WhatsApp for Executive Proposal